⟳
REPEAT PART
| Operation |
Time (min) |
|
Cost/Pc |
ACTUAL (min recorded) |
| TOTAL LABOR |
|
— |
|
Setup amortized over qty · Ops = operations/setups · Rate: $125/hr · Record actuals after the job runs — feeds the learning loop
| Process |
Vendor |
Basis |
Cost |
Lead Time |
Notes |
|
| OUTSIDE PROCESS / PC |
$0.00 |
|
Basic assembly: hours × shop rate. Feeds into sell price. Full assembly module (kitting, sub-ops) in a future update.
Risk Flags — click to toggle
Risk Multiplier
1.00×
LOW RISK
Labor (per piece)$0.00
+ Overhead$0.00
Material (raw)$0.00
+ Material Markup$0.00
Outside Processes (raw)$0.00
+ OP Markup$0.00
Assembly$0.00
NRE (per piece)$0.00
Raw Cost / Piece$0.00
Risk Multiplier1.00×
Adjusted Cost / Piece$0.00
SELL PRICE / PIECE
$0.00
⚠ THIS PART NUMBER EXISTS — ARE YOU CREATING A NEW REVISION?